Published project experience

Sales proof built from scope, year and tonnage.

The existing TDS project record is strongest when the work itself is made visible. This page turns the published list into scannable proof without inventing contract values, outcomes or client claims that are not stated.

Important contextContract value and project outcomes are not published on the source project list, so they are intentionally not presented here as facts.
Featured record · Finsch Mine

Repeated underground steelwork and material-handling scope.

Published entries cover 2015–2016 underground conveyors, bulkhead steelwork and platework, tip steelwork, followed by 2017 underground steelwork, bins, chutes, tip steelwork and tip barrier walls.

568 t2015–2016 listed tonnage
284 t2017 listed tonnage
2015–17published record span
Selected records

Named projects with measurable published scope.

Tonnage below is reproduced or arithmetically combined only where the published TDS project list gives the component figures.

Kloof Mine · 2005–2006

Shaft pillar steelwork for No. 1 and No. 2 sub-vertical shafts

495 t 260 t + 235 t published
Shaft steelwork
Royal Bafokeng Rasimone Mine · 2005–2006

Underground conveyors, bulkheads, load bins, station steelwork and platework

597 t+ quantified items only
ConveyorsBulkheadsBins
SMEI · Impala Plats · 2008–2009

Six overland conveyors and eight transfer towers

372 t published tonnage
ConveyorsTransfer towers
DRA · DRC · 2010

Twelve overland conveyors, bin and transfer towers

360 t published tonnage
ConveyorsBins
Bambanani East · Harmony · 2013

Shaft steelwork

354 t published tonnage
Shaft steelworkHarmony
Koffiefontein Mine · 2016

Bulkhead steelwork, bins and chutes

211 t published tonnage
BulkheadsBins & chutes
Project ledger

The broader published record.

A compact chronology of project entries currently published by TDS.

Kloof Mine · 2005–2006

Shaft pillar steelwork — 260 t and 235 t.

Royal Bafokeng Rasimone Mine · 2005–2006

Underground conveyors, bulkheads, platework chutes and grizzles, load bins and station steelwork.

Murray & Roberts · Impala Plats · 2007

Five-deck sinking stage — 94 t.

ELB · Voorspoed Mine · 2007

Overland conveyors and transfer towers — 320 t.

Read Swatman & Voight · 2007

Underground bulkheads and conveyors — 320 t.

SMEI · Impala Plats · 2008–2009

Six overland conveyors and eight transfer towers — 372 t.

DRA · DRC · 2010

Twelve overland conveyors, bin and transfer towers — 360 t.

Voorspoed Mine · 2011

Waste dam conveyor and tripper — 111 t.

Bambanani West Shaft · Harmony · 2011

Surge bin and shaft steelwork — 268 t.

Murray & Roberts Cementation · 2012

Five-deck sinking stage 94 t; cirb ring and shutter 30 t.

Bambanani East · Harmony · 2013

Shaft steelwork — 354 t.

Joel Mine · Harmony · 2013

136LEV conveyors and steelwork — 126 t.

Greenstone · 2015

Reclaim ore bin — 218 t.

Finsch Mine · 2015–2017

Underground conveyors, bulkheads, platework, tip steelwork, underground steelwork, bins and chutes — published entries of 384 t, 184 t and 284 t.

Koffiefontein Mine · 2016

Bulkhead steelwork, bins and chutes — 211 t.

What is not claimed

No invented project values. No manufactured outcomes.

The source record does not consistently publish contract values, programme outcomes or testimonial-style results. This redesign uses the verified scope, client/site association, year and tonnage instead.